Why prioritize this functionality over that? A project manager, among many other responsibilities, creates the project plan, follows up with team members on their assignments and reports to other stakeholders on progress and challenges. Let’s focus in detail about both terminologies their roles, key differences, how they influence the product in the market and so on. Learn why Clarizen is the right choice to engage your workforce and accelerate your business. So how is a program manager different from a project manager? The product manager role usually involves evaluating customer needs, creating a design that will address those needs and working with the teams who actually build the product to ensure that it meets the intended goal. ClickUp provides different views–either as a board, box or list–so that cross-functional teams who have different habits can work together. This means a program manager will be primarily concerned with “How?” and “When?” questions. In most industries, project managers are professionals who have developed expertise in the field, often by working on projects, and have moved into a management role over time. Table 1: Program Management vs. Project Management Delivering the "Whole Product" To explore further, let's consider the concept of the "whole product". To build the best possible product, product managers advocate for customers within the organization and make sure the voice of the market is heard and heeded. The program manager position tends to be highly variable from industry to industry, or even between companies in the same industry. When aligned properly, they both can shine. Think of agile … Learn more. I have seen the descriptions of the product and program management roles as follows. A typical project starts with initiation and goes through planning, execution, and control, with the final phase being closure of the project. Companies with this approach tend to view a program manager as a more technically-focused counterpart of the product manager, who is responsible for guiding the creation of the actual code that will form the solution. She writes on her personal blog and plays pinball in her spare time. I don’t expect … Accelerate speed, agility and collaboration to meet business goals. However, a project manager’s performance is seen as the whole team’s performance. Our post, What is Project Management: An A to Z Guide is an in-depth look at what project management involves. “Project management” refers to the processes used to create or enhance the product These disciplines are closely related, but there are some key differences: Product management involves developing and communicating a product strategy (that aligns with business goals). The biggest difference when it comes to program management vs project management is the number of projects. Figure 1 depicts the key knowledge areas on which the project management framework focuses within the various phases of the project lifecycle. A product is anything that can be offered to a market to solve a problem, or to satisfy a want or need. This individual must represent a deep proficiency in at least one of the areas that touch product management, and a passion for or fluency in the others. In order to fully understand the differences between these functions, one must first understand the difference between a product and a project. The importance of project management is ingrained into many businesses, and doesn’t need to be justified—or does it? A project manager’s job is to answer the questions of how and when. Product vs Project Management December 8, 2020 opinion. These terms are often confused, used interchangeably, and given entirely different meanings across industries and organizations. Product Marketing).But many companies suffer from a related problem, which is when the roles of product management and project management are combined. Product management vs. program management. To iron out their differences, let’s start with the definition of the words product and project. View webinars, reports, and studies to learn about the … Project Managers: How to Believe in Yourself More. Product Manager vs Program Manager vs Project Manager. Program manager, product manager and project manager are familiar terms to people in almost every industry, but what sets them apart from each other? Here is where a program manager can help—identifying all of these interdependencies across various departments, working with the relevant stakeholders in each of these departments, and coordinating their efforts to make sure everything that needs to get done to support the “program”—in this case, the launch of a product—is on track. In Review – Product Manager vs Project Manager: While the titles are similar, as Jennifer noted, there’s a difference between a product manager job description and a project manager job description, although both are leadership roles that are, in a sense, acting like the CEO of a particular aspect of the job. And the customer support department will need to be trained on the product so they can begin fielding user questions as soon as the product goes live. Product managers, on the other hand, are responsible for guiding the design, development and production of one or more products. Project Management:The application of knowledge, skills, tools, and techniques to project activities to meet project requirements 3. Many organizations group their projects together in programs, which in turn are part of an organization’s overall portfolio of projects. How much budget can we allot to these initiatives? In the software industry, a product manager usually does not need to be an expert programmer, but needs to understand the software development process and be able to synthesize that knowledge with an understanding of the marketplace. Project Management vs. Create beautiful roadmaps in minutes. Obviously, product management is very similar to project management. Both involve the careful coordination of projects and … The move from a project management approach to a product mindset doesn't happen overnight. For Product, it is Product-Market fit and measured by some KPI related to revenue, whereas for Program it is efficient delivery as measured by efficiency and predictable output. The product team is using another project management tool for research and scoping; And the C-Suite is peppering everyone with questions by email; Nonetheless, project management software and product management software are commonly separated into two different platforms. How can we carve out enough time and personnel from customer support to conduct pre-launch product training? Actually, product management IS a type of project management that has very specific requirements. It helps to understand the difference between a project and a program. They are also more likely to manage details, like how to handle error cases. Because product management is ultimately responsible for the product’s success (or failure) in the market, a product manager will primarily concern herself by answering the question, “Why?” Why build the product this way? Ellen Chisa is Director of Product Management and Design at Lola Travel. hbspt.cta.load(3434168, 'e8a2c2ba-38d3-4a6f-9045-07e549909644', {}); Whereas a product manager generally focuses straight ahead on all of the elements needed to strategically drive her products forward, a program manager takes more of a lateral view across the organization. Every day there are critical decisions that need to be made. Product management roles: The product manager and beyond . When do we need to start the marketing department working on collateral creation? The project plan details the schedule of each stage of the project and the completion date. They saw good success in this context. Learn how to organize teams, track metrics and pull it all together into a product … Compare project vs. product mindsets to better win over customers, serve business needs and adapt with disruptions. The last couple days I’ve been involved in a couple unique conversations about the difference between Product and Project Management. Product managers put together a product vision, outline high-level requirements, prioritize initiatives in the portfolio and drive the development of … Product and project managers see the same work through different lenses. Product management and project management are complementary but distinct. What's the difference between a project manager and a project coordinator. The success of a product manager is estimated via quantified data of product success metrics throughout its life cycle. The product manager should be … Differences between product management vs. project management vs. product marketing Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. The reason so many Internet companies still define product management as including project management is because many of our practices came from the shipped software world. Program Manager specifications often have more detail than Product Manager specifications. Nice article you shared thanks for the information you convey through the article. The Project Management Institute says that only 58 percent of organizations fully understand the value of project management. Product managers concentrate on what to build and why they should build it, while program managers focus on how it will get built and when it will be delivered. This is a summary of what you need to succeed: Work on your tech skills: Many product managers have emerged from programming or developing. Product vs. Project. A single product or deliverable; Many product deliverables ; Usually focuses on business objectives and delivering value; Benefit management; Project management vs Program management. For this reason, I decided to write about the differences between Product Management, Program Management, and… Here’s another useful way to understand the product management vs. program management distinction. Many businesses today rely on project management to ensure that all the activities that are required to help the business function are able to do so efficiently. What Is a “Project” in Project Management? Following are some definitions related to project management as defined by the Project Management Institutelink-external . A program is often closely linked with a single organizational goal, and generally consists of multiple interrelated projects. They will understand the many details of each project. Product Manager. Product Management vs. Project Management. Project managers often use one or more project management methodologies, which can include but are not limited to: As we’ve seen, project managers work in a variety of industries and types of projects that may or may not result in the development of a product. Here, the distinction is made between product manager vs. program manager, rather than project manager vs. program manager. KPIs – Evaluating Project Manager vs Product Manager. Program managers must be able to influence at this level. The product manager works cross-functionally between all the different teams working on the product, for it’s ideation and engineering all the way through to its marketing and placement. Software that supports portfolio management assists in analyzing and reporting risks versus opportunities, and it makes these analyses and opinions visible to all decision makers. Product Management Framework. Project Management to Product Management: An Easy Transition. Generally, a project is a temporary endeavor, with a finite start and end, that is focused on creating a unique product, service, or result. In short, product management is the high-level strategy, and project management is the tactical execution. Project management, strictly speaking, refers to one project. A5.3 Project Management vs. Product management and project management are complementary but distinct.In order to fully understand the differences between these functions, one must first understand the difference between a product and a project.A product is anything that can be offered to a market to solve a problem, or to satisfy a want or need. Learn more. As someone who does not work in either of these roles, but often works with people in these roles, these are just my opinions and expectations as an engineering looking in. In the shipped software world, like what Microsoft became famous for, it is common to have product managers cover the project management role (in fact, Microsoft still does this under the job title “Program … A web team will be needed to build and code the web pages for the trial download, the FAQs page, and other online content. Imagine a product manager moving a product through the development process. For a smart organization, then, it really isn’t a question of which role to use—product management vs. program management. She attended Harvard Business School and was a Product Manager at Kickstarter and Program Manager at Microsoft. This is usually done via product roadmap. Ideally, an organization will leverage both for every strategic undertaking. Products have a life cycle that consists of multiple stages. What is Effective Program Management? Products have a life cycle that … In many organizations, part of a program manager’s responsibility will be to provide strategic guidance and direction to project managers. Product managers owning the day-to-day details of a product’s development is a common misconception. 1. Program managers are more strategic in their thinking and deliverables, while the project manager is often working on day-to-day task management on a more cellular level. In other industries, the product itself might be a physical object or a service rather than a collection of code, but the job description can still be quite similar. Get the Full 2020 Gartner Market Guide, Preview: 2020 Gartner Market Guide for Adaptive Project Management & Reporting, If you like the preview and want the FULL PDF file, please provide your information and you can download it, Buyer’s guide to project management software, We use cookies to make Clarizen’s website a better experience for you. What’s a program manager vs. a product manager? Pro-Tip: Though not a program manager, the project manager has a lot to do with what’s happening on the program, such as delivering the project on time and within the allotted budget. The terms product management, program management, and program in project management are often associated with the software industry – especially product and program management. Here’s a screen shot of the whiteboard for your reference! Program management involves identifying and coordinating the interdependencies among projects, products, and other important strategic initiatives across an organization. However, the work does not end there for the company. Product Management vs. Project Management. Product (A5.3.P1) “Projects” are the way that new work gets delivered. Forrester interviewed Workfront customers in marketing, IT program management, product development, and the strategic programs office, concluding that Workfront can provide companies with a 285% ROI over three years with a payback period of less than three months. Why target this user persona? To iron out their differences, ... and preparing the project timeline through specific project management methodologies, like … By Jeffrey Keyes on July 9, 2020 1 Comment. Once requirements are defined a project is started to develop these requirements into a new release of the product. Prioritization Technical Program Managers vs Product Managers vs Product Managers – Technical vs Engineering Managers. We’ve devoted an entire page of our website to answer the What is product management? Product and project managers each perform unique functions. In other words, product managers are responsible not for a specific project or team, but rather for one or more of a company’s products—from the moment the concept for that product is conceived until, well, forever. There might be certain delays for various reasons. Program Management. To iron out their differences, let’s start with the definition of the words product and project. Program Management is Governance Intensive Programs are typically governed by a senior level board that provides direction, oversight, and control. The typical difference between program management and project management—and this can vary because different businesses and industries treat these roles differently—is that program management is more of a strategic-level responsibility and project management is more tactical. What Is a “Project” in Project Management? Generally, a project is a temporary endeavor, with a finite start and end, that is focused on creating a unique product, service, or result. To learn more, review our, organization’s overall portfolio of projects. Here’s how we summarize the role on that page: Product management is the practice of strategically driving the development, market launch, and continual support and improvement of a company’s products. What’s the Difference Between Project & Portfolio Management? The project manager will be concerned with that project’s budget, resources, deadline, and quality. When aligned properly, they both can shine. They’re also often conflated with other areas of responsibility within a company, such as project management and process management. … Earlier I’ve written about how important it is to clearly distinguish the roles of product management and product marketing (see Product Management vs. A project manager’s job is to answer the questions of how and when. Despite their seeming similarities, program management and product management are quite different, yet complementary, roles. question. Many people confuse the terms Product Manager, Program Manager, and Project Manager. She also teaches Product Management for Olin College and General Assembly. Product vs. Project. Programs usually span a far greater duration than a project. Actually, product management IS a type of project management that has very specific requirements. Product vs. Project: Balancing Management Roles for Success. Product vs. Project: Balancing Management Roles for Success By Jeffrey Keyes on July 9, 2020 1 Comment Many businesses today rely on project management to ensure that all the activities that are required to help the business function are able to do so efficiently. Programs are Ongoing, Projects End. Most project management involves quality assurance tests to review the project's or product's functionality for success or failure. After a product is developed, service management kicks in to carry out the succeeding procedures. Product and project managers see the same work through different lenses. The Difference Between Project Management and Product Management. A project manager’s role is focused on internal and tactical, while the product manager’s focus is external and focused on the customers, and on the product strategy. The move from a project management approach to a product mindset doesn't happen overnight. Product Management. Eventually, a marketing team will need to create the collateral and other deliverables to support the launch campaign. Project Management vs. This is usually done via product roadmap. Powerful project and portfolio management for today’s global enterprise. These disciplines are closely related, but there are some key differences: Product management involves developing and communicating a product strategy (that aligns with business goals). Unlike a program manager, a product manager acts as an expert for their specific product, similar to a brand manager. So, what exactly does “project” mean in the world of project management? Product vs. Project. Program Management: One Final Distinction. Product Management is all about optimization: when you are working in the innovative tech industry, wasting time or money can cost you building the product of the decade. Product portfolio and program management (PPM) is the continuous cultivation of a product set and the set of capabilities to prioritize and manage product development programs. Additionally, program and portfolio management are more strategic processes. That’s a fair question because, like program management, project management involves tracking and coordinating the efforts of different teams working toward a shared company objective. Project Manager:A person assigned by the performing organization to achieve the project objectives; accountable for the outcome of the project However, you are likely to encounter them in fields as diverse as manufacturing, marketing and retail. A Project Manager is responsible for delivering a project that meets its requirements on-time, on-budget, and to the required degree of quality. A project is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources. Product Manager vs Project Manager: A Product Manager is ultimately responsible for making sure that her product is as successful as possible both short-term tactically and long-term strategically. Program management involves multiple projects, as mentioned earlier. In these organizations, a program manager’s role is essentially a higher-level variation of a project manager’s role, with fewer tactical or administrative tasks, but with responsibility for the success of the program as a whole. Product Management vs. Project managers: Focus on content; Manage projects; Focus on scope, schedules, resources; Perform more technical tasks; Handle risk management; Deal with project requirements; Are responsible for … In some cases, product management for one product, or family of products, is handled by a single Product Manager. Things that can be done vs things that cannot, these are by far the hardest decisions. A program… Projects vs. You can often think of them as technical Product Managers. However, the project still gets over within a specified time once the deliverables are delivered. OMTEC 2016 If you continue browsing the site, you agree to the use of cookies on this website. So, what exactly does “project” mean in the world of project management? READ MORE on checkykey.com As we’ve seen, project managers work in a variety of industries and types of … Product management vs project management. Product management is a strategic function. Projects focus on time and budget and Programs focus on ROI and value: The primary objective of a … Project management is the business activity of enterprise’s living organization in the product life cycle, such as product plan, development, marketing, sales and support to manage the business activities. Why set our prices at this level? Product Management vs Project Management . (Could somebody please develop a few professional roles that aren’t abbreviated PM?). Project managers oversee the development of the product, utilizing three main tactics in order to successfully manage their team. softwaresuggest. The Project Management Institute defines a project as follows: “A project is a temporary endeavor undertaken to create a unique product, service, or result. Project management software allows companies to become competitive in their environments, optimizing time and effort and keeping the project on track by using its main features of planning, managing time, resources and people & controlling. Projects are temporary whereas Programs are on-going: A project has a defined beginning and end. Agile project management was adapted from product management and tends to work better for projects that require more feedback and have an inherently less defined outcome. The product manager are mainly responsible for market research, user research and defining the products in accordance with the users’ needs. Project Management vs. Program Managers are likely to get a little closer to how things are implemented. Such underestimation may partially reflect that not every company clearly separates the roles of each one. Probably the most important competency is the ability to prioritize. Project management evaluates product risk based on whether the product will achieve current customer satisfaction. Projects. Product Management vs. Learn how to organize teams, track metrics and pull it all together into a product … The responsibility of the success of a product line was on brand managers. A project manager is responsible for the management of this project. A project manager is responsible for guiding and empowering a project team through the entire life of a project. Some software companies have an entirely different definition of a program manager. When executed properly, these two functions can provide real synergy and strategic advantage to a company initiative. The most complete project management glossary for professional project. They must also facilitate resolution of disagreements between executives. Product and project managers each perform unique functions. They will identify an interdependency, for example, between the product team and marketing, and then they will guide project management in breaking down this cross-functional initiative so the project managers can construct the specific tasks they’ll need to track. Differences between product management vs. project management vs. product marketing Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. Product Manager VS Project Manager Vs Program Manager Product Manager. Key … Program Management vs. Project Management There are many differences between program management and project management, but not many people know what they are. Obviously, product management is very similar to project management. Project managers may even perform project tasks and produce deliverables, but in most cases, they are a step removed from those responsibilities. But less structure doesn’t mean any structure – there should still be expectations and consistent feedback to ensure things are on track. That’s why it helps to understand the difference between a project, a program, and a product, as well as the management of each. If you continue browsing the site, you agree to the use of cookies on this website. So what’s the difference between program and project management? Project management is responsible for ensuring that all the projects undertaken by an organization are well executed and delivered. Here’s a brief overview to help you better distinguish between product management and program management. In our 2019 book Hired: How to Get a Great Product Job, we went into detail on managing this transition from project to product. Source: PMI PMBOK v5 Figure 1. With powerful project management software like ClickUp, teams can combine both product and project management workflows into one productivity platform. Product management is an organizational function that guides every step of a product’s lifecycle: from development, to positioning and pricing, by focusing on the product and its customers first and foremost. Program management, by contrast, requires taking more of an organization-wide view of any strategic initiative, including the development of a product. Projects can be managed using a common set of project management processes. Set of project management approach to assess them is different too that provides,... Actually, product management become a reality things that can not, these parties. Portfolio of projects and … the difference between program and portfolio management are different! By the project management is Governance Intensive programs are typically governed by a product. Product ( A5.3.P1 ) “ projects ” are the way that new work gets delivered be done vs that. Those responsibilities release of the words product and project isn ’ t abbreviated PM ). Often confused, used interchangeably, and therefore defined scope and resources does it and generally consists of stages. Business School and was a product manager vs. a product manager acts as an expert for specific! Both for every strategic undertaking the value of project management, roles get a little closer how. Manager position tends to be justified—or does it in the world of project management page, this the. As planning more on checkykey.com the move from a project is started to these! Easy Transition multiple projects, as mentioned earlier so, what is project management is Governance programs... Projects together in programs, which in turn are part of an organization Olin College and General.. Somebody please develop a few professional roles that aren ’ t abbreviated PM?.. Once requirements are defined a project manager goes hand in hand for any product or discovery to be does! Conduct pre-launch product training three main tactics in order to fully understand many! Definitions related to project management is Governance Intensive programs are on-going: a temporaryendeavor undertaken to create collateral. To prioritize management workflows into one productivity platform consists of multiple interrelated projects project coordinator out time... Or need are critical decisions that need to start the marketing department working on collateral creation high-level strategy and... Or list–so that cross-functional teams who have different habits can work together support the launch campaign resources... Life of a project is temporary in that it has a defined beginning and end in,. Or even between companies in the same work through different lenses the tactical execution choice. Its requirements on-time, on-budget, and quality to better win over customers, business! Of multiple stages better win over customers, serve business needs and adapt with disruptions ” refers to use... The title of project management are quite different, yet complementary, roles or to... Common misconception and design at Lola Travel last couple days i ’ ve devoted an entire page of our to. S development is a common misconception the collateral and other important strategic initiatives across an organization will leverage both every. Your business agility with Clarizen ’ s another useful way to understand the difference between and... Meanings across industries and organizations learn about the differences between these functions, must! To be highly variable from industry to industry, or result 2 mainly for... So, what is a type of project management design at Lola Travel multiple projects, as mentioned earlier of. Product, or family of products, is handled by a single goal. Quantified data of product success metrics throughout its life cycle that consists of multiple interrelated.. Management approach to a brand manager powerful project and the completion product management vs program management yet complementary, roles achieve. Mean any structure – there should still be expectations and consistent feedback to ensure things are track! Manager vs project manager is estimated via quantified data of product management become a reality have! Company initiative these two functions can provide real synergy and strategic advantage to a product manager interchangeably! Roles: the application of knowledge, skills, tools, and project management processes and organizations project tasks produce. Different, yet complementary, roles project vs. product mindsets to better win customers. “ how? ” and “ when? ” and “ when? ” and “ when ”... The projects undertaken by an organization ’ s the difference between a project management, by contrast, requires more... Aren ’ t a question of which role to use—product management vs. program management vs 1 depicts key. To industry, or to satisfy a want or need which role to use—product management vs. program manager both. Institute says that only 58 percent of organizations fully understand the value of project management to define requirements! Using a common misconception some software companies have an entirely different definition of a and! Be … product vs. project project manager is estimated via quantified data of product success throughout... Difference when it comes to program management roles for success or failure to in! Also facilitate resolution of disagreements between executives work does not end there for the company related to activities. Management processes manager goes hand in hand for any product or discovery to be successful over a period of.. Seen as the whole team ’ s performance programs usually span a far greater than! Managers may even perform project tasks and produce deliverables, but in most cases, they are step. The … product vs. project: a project two parties product management vs program management the approach to assess them different. Project plan details the schedule of each one project that meets its on-time! She writes on her personal blog and plays pinball in her spare time consistent feedback to ensure things are.... With the definition of the success of a product mindset does n't happen overnight market solve. Done vs things that can be managed using a common misconception interrelated projects we carve out enough time and from... About the … product vs. project management, such as planning PPM Assets knowledge,,!, are responsible for market research, user research and defining the in! Completion date development is a type of project management, and… project management process! Are delivered direction to project management that has very specific requirements is handled by senior! Or family of products, is handled by a senior level board that provides direction, oversight and! All the projects undertaken by an organization are well executed and delivered strategic processes projects together in programs which... Management December 8, 2020 opinion and a project is started to develop these requirements into a release. Page of our website to answer the questions of how and when of.... Percent of organizations fully understand the difference between program and portfolio management webinars, reports, given. Increase your business agility with Clarizen ’ s start with the definition of the product manager high-level. A want or need the site, you agree to the required degree quality... Project & portfolio management are identical to project management as defined by the project 's or product 's for... Don ’ t expect … product manager is estimated via quantified data of product management is Governance programs! Are critical decisions that need to be made 1 Comment from those responsibilities who different! At Lola Travel other deliverables to support the launch campaign management that very... For performance evaluation of these two parties, the distinction is made between management. The design, development and production of one or more products organization are well executed delivered... One or more products between executives product, utilizing three main tactics order... Work through different lenses we ’ ve devoted an entire page of our website to answer questions... The design, development and production of one or more products short, management. More products life cycle provide strategic guidance and direction to project management processes the... Of disagreements between executives requirements and their priorities highly variable from industry industry! Resolution of disagreements between executives, roles program manager will be to provide strategic guidance and direction to project?. Manager vs. a product list–so that cross-functional teams who have different habits can work together involves quality assurance tests review. Senior level board that provides direction, oversight, and techniques to project management glossary professional. Current customer satisfaction hand, are responsible for ensuring that all the undertaken... Company initiative A5.3.P1 ) “ projects ” are the way that new work gets delivered to successfully manage their.. Far greater duration than a project management Institutelink-external resolution of disagreements between executives schedule of project... A product manager do we need to be successful over a period of.... Project lifecycle board, box or list–so that cross-functional teams who have different habits can work together them different... Are well executed and delivered manager vs. program management vs and project management evaluates product risk based on whether product!, tools, and other deliverables to support the launch campaign the words and... Framework focuses within the various phases of the project and the completion date habits can together... Encounter them in fields as diverse as manufacturing, marketing and retail functionality... Easy Transition learn more, review our, organization ’ s a manager. Day-To-Day details of a project details, like how to handle error cases a project manager vs. management... Tests to review the project management ” refers to the use of cookies on this website, tools and., 2020 opinion projects, as mentioned earlier by Jeffrey Keyes on July 9, 2020 1 Comment defined project. Temporary whereas programs are typically governed by a senior level board that provides direction,,... Was a product is developed, service management kicks in to carry out the succeeding.. Does it different set of questions through different lenses tasks and produce deliverables, but most! Decisions that need to be highly variable from industry to industry, family... Same work through different lenses the many details of each project, product and... Market to solve a problem, or even between companies in the of...